Check when each via can actually be made

To review an HDI fabricator’s build sequence, assign every required via span to an intermediate board state. Record the exposed entry surface, the target layer, and the operation that makes the connection conductive. A finished cross-section is incomplete if one of its connections has no corresponding manufacturing stage.

The worksheet below applies that check to an illustrative eight-layer, 2+4+2 construction. It extends the sequential lamination guide with specific layer numbers and review decisions. It is a discussion model, not a qualified process recipe or a statement of manufacturing capability.

Freeze the layer names before reading the sequence

Number the final copper layers L1 through L8 from top to bottom. Keep those final names on every intermediate sketch. The four-layer central subassembly is therefore L3–L6; do not relabel it L1–L4 while reviewing it. Otherwise, a file labeled “1–4” could mean either a subassembly through hole or a different span in the final board.

For this example, request a mechanically drilled L3–L6 buried span, laser microvias L2→L3 and L7→L6, and a second level of laser microvias L1→L2 and L8→L7. Include an L1–L8 plated through hole only where the design needs it. Arrows identify the entry side and target of each laser operation; a span alone does not describe pad diameter, hole geometry or filling.

Altium’s via-definition documentation, updated October 5, 2026, separates layer-span definitions from via dimensions and describes separate microvia drill outputs for each layer pair. Use both parts of that information in the handoff. A named CAD via type does not establish that a supplier has approved its construction.

Walk through three intermediate board states

An illustrative 2+4+2 board grows from four to six to eight copper layers State A contains layers 3 through 6. State B adds layer 2 above and layer 7 below. State C adds the final outer layers 1 and 8. The exposed surfaces change at each state, while final layer numbers stay fixed. A · central subassembly B · first build-up C · second build-up L3 · exposed topL4 / L5 · internalL6 · exposed bottom L2 · exposed topL3–L6 retainedL7 · exposed bottom L1 · final topL2 · now internalL3–L6 retainedL7 · now internalL8 · final bottom 4 copper layers4 + 2 = 6 layers6 + 2 = 8 layers
Original sequence map: copper-layer groups only, with no dimensional scale. Dielectric regions, circuit patterns and via locations are omitted. The table identifies the required connections.

At state A, the L3–L6 hole traverses the central subassembly. It becomes a buried via relative to the completed board after outer layers are added. At state B, L2 and L7 are accessible from outside, so the example assigns L2→L3 and L7→L6 to that stage. At state C, L1 and L8 become the entry surfaces for the final microvias.

Use these as review checkpoints. The fabricator must supply its actual imaging, drilling, cleaning, metallization, plating, filling and planarization order. Altium’s sequential build-up overview, updated September 20, 2025, describes repeated layer addition and microvia processing, including additional preparation for stacked structures. It supports the stage concept, not a universal traveler for every material or copper process.

Reconcile six span definitions with the proposed traveler

Example via-to-stage worksheet; identifiers are illustrative
ID / final spanAssigned stateRequired operation and evidence
V01 · L3–L6A · L3 and L6 exposedMechanical drill and plate through the central subassembly. Identify required fill or surface preparation before it is enclosed.
V02 · L2→L3B · entry L2Laser to the L3 target, then metallize/plate. Record how this structure is prepared for the next build-up.
V03 · L7→L6B · entry L7Laser from the bottom side to L6. Confirm bottom-side numbering in the output and drawing.
V04 · L1→L2C · entry L1Laser to L2. Identify whether its target is separate from, or above, V02.
V05 · L8→L7C · entry L8Laser to L7. Identify its relationship to V03 and the required target preparation.
V06 · L1–L8C · full stack presentIf used, mechanical through-hole drilling and plating. Confirm the supplier’s order relative to outer-layer processing.

There are six span definitions here, not six physical holes or six lamination cycles. V02 and V03 may share a build-up stage but still need unambiguous layer-pair identification. Preparing the central subassembly can itself require bonding operations. Consequently, “2+4+2” does not supply the total press-cycle count for a quotation.

For each row, add the actual CAD via-type name, output file or dataset feature, hole count, fabrication-note reference and traveler step. Check the exported data against the source layout, using the drill-file handoff checklist. Investigate both a used CAD span with no output and an output span with no approved drawing entry.

Find contradictions before approving the build

Three useful discrepancy tests for this example
ObservationReview decision
V02 is assigned only after L1 is addedL2 is no longer the exposed entry surface. Ask for the missing earlier operation or a revised construction; the current explanation does not create the specified L2→L3 feature.
L1→L2→L3 is replaced by one L1→L3 symbolClarify whether a skip via is now proposed. A two-feature chain and a single skip feature need different span definitions and approval.
The bottom output is labeled L6→L7 while the drawing shows L7→L6Resolve whether this is merely a naming convention or a reversed laser entry direction. Do not infer equivalence from the same two layer numbers.

Then inspect lateral geometry. For a staggered L1→L2→L3 route, show the L2 copper that connects the two landing locations. For a stacked route, show the alignment and required preparation beneath the upper microvia. Use the published via transition matrix example to keep the electrical path separate from the manufacturing-span list.

Close the review with evidence and revision control

A logically consistent sequence does not prove reliability. IPC’s March 6, 2019 microvia warning reports failures that escaped conventional acceptance and appeared later, including during assembly. This historical warning explains why sequence review needs a separate acceptance discussion; it is not the current purchase specification.

  • Materials: identify the actual dielectric constructions and ask the fabricator to assess them against its proposed processing and thermal exposures.
  • Dimensions: reconcile dielectric thickness, copper thickness, via geometry and registration allowances on the same stack revision.
  • Acceptance: agree the applicable specification revision, representative structures, thermal/electrical evaluation and evidence to be delivered.
  • Closure: give every open discrepancy an owner and disposition. Return approved changes to CAD, the drawing and manufacturing outputs together.

The stackup explorer can help organize an early construction discussion. Attach the supplier’s actual sequence and completed worksheet to the release package so that a later reorder can be checked against the same baseline.

Request a review of your HDI build sequence

Provide Gerber, ODB++ or IPC-2581 data; the final numbered stack; via-span and drill-pair definitions; a fabrication drawing; and the proposed sequence with unresolved rows marked. Include quantity, acceptance/test requirements and the requested delivery date for quotation context.

Send your stackup and build-sequence questions

For initial coordination: WhatsApp +86 136 0042 7328.